• Contacto
  • Sugerencias
  • Acerca de
    • Repositorio Institucional del CONACYT
    • Preguntas frecuentes
    • español
    • English
Ver ítem 
  •   RI-CONACYT Principal
  • Producción científica
  • Artículos científicos
  • Ver ítem
  •   RI-CONACYT Principal
  • Producción científica
  • Artículos científicos
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Integrating Real Options Analysis with long-term electricity market models

Thumbnail
Artículo científico de suscripción - Resumen (15.97Kb)
Exportar
RISMendeleyRefworksZotero
Compartir
URI
http://hdl.handle.net/20.500.14066/4453
Registro completo
Mostrar el registro completo del ítem
Autor(es)
Ríos Festner, Daniel AlbertoAutoridad CONACYT; Blanco Bogado, Gerardo AlejandroAutoridad CONACYT; Olsina, Fernando
Fecha de publicación
2019-01-08
Tipo de publicación
research article
Materia(s)
Power generation
Power market
Real options
Stochastic simulation
Strategic flexibility
System dynamics
 
Resumen
In liberalized electricity markets, the investment postponement option is deemed decisive for understanding the addition of new generating capacity. Basically, it refers to the possibility for investors to postpone projects for a period while waiting for the arrival of new and better information about the market evolution. When such development involves major uncertainties, the generation business becomes riskier, and the investors' “wait-and-see” behavior might limit the timely addition of new power plants. In that sense, the literature provides solid empirical evidence about the occurrence of construction cycles in the deregulated electricity industry. However, the strategic flexibility inherent to the option to defer new power plants has not yet been rigorously incorporated to investment signals in existing market models. Therefore, this paper proposes a novel methodology to assess the long-term development of liberalized power markets based on a more realistic approach for valuing generation investments. The work is based on a stochastic dynamic market model, built upon System Dynamics simulation approach. The decision-making framework considers that the addition of new capacity is driven by the economic value of the strategic flexibility associated with deferring investments under uncertainties. Thus, the value of the postponement option is quantified in monetary terms through Real Options Analysis. Simulations confirm the cyclical behavior of the energy-only market in the long run, as suggested by the empirical evidence found in the literature. In addition, sensitivity analysis regarding some relevant exogenous variables depicts an even more fluctuating evolution of the capacity due to the combination of strong demand growth rates with large volatilities. Finally, the model validity is assessed through a formal procedure according to the scope of System Dynamics modeling approach.
Colecciones
  • Artículos científicos

Listar

Todo RI-CONACYTComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasPerfil de autorEsta colecciónPor fecha de publicaciónAutoresTítulosMaterias

Mi cuenta

Acceder

Estadísticas

Ver Estadísticas de uso

Consejo Nacional de Ciencia y Tecnología (CONACYT)

Dr. Justo Prieto N 223 entre Teófilo del Puerto y Nicolás Billof, Villa Aurelia.

Telefax: +(595-21) 506 223 / 506 331 / 506 369

Código Postal 001417 - Villa Aurelia

Asunción - Paraguay